Back to News
Project Coverage

Shifting Sand Forces Revamp of Reef Project

ReefMaker Editorial TeamSeptember 28, 20171 min read
Share
Shifting Sand Forces Revamp of Reef Project
Navarre Press reports on field adjustments during the expansion of the Navarre Beach nearshore snorkeling reef.

Walter Marine began expanding the Navarre Beach snorkeling reef with concrete and limestone disc modules set on fiberglass pilings. Shifting sand made the first planned rows too shallow to meet required vessel clearance, so the project team removed 12 modules from the permitted layout.

The remaining structures continued in approved positions east and west of the original reef. Funds associated with the unused modules were redirected toward a separate fishing and diving reef. The adjustment shows how permit limits, water depth and changing bottom conditions shape nearshore deployment work.

Navarre BeachSnorkeling ReefNearshore ReefDeployment
Originally published by Navarre Press on September 28, 2017, Staff Reporters.
Read the original article at Navarre Press

Read the original staff report at Navarre Press.

Read the original coverage

Related News